| e-mail stedipower@tvss.net ::: Phone: 678.546.6780 |
| GENERAL ANNUAL CHECKS |
| (1) Review past maintenance records to find repair patterns. These records may point to certain components that should be closely inspected during performance of preventive maintenance. |
| (2) Review operator records concerning electrical load readings; compare with equipment ratings. Operator records regarding operating temperatures and any documented abnormal circumstances associated with the system should also be reviewed. |
| (3) Inspect Secondary Electrical Distribution Equipment: |
|
| (4) Remove debris, dirt, and other foreign objects from all components, housings, cabinets, panels, etc. |
| (5) Torque all electrical connections to design value.. |
| (6) Verify operation of space heaters and control thermostat. Check thermostat set point for proper setting. |
| (7) Verify the grounding of the equipment and associated neutral where applicable. |
| (8) Conduct infrared test on all main current carrying equipment for hot spots that may indicate overload conditions or loose connections. |
| (9) Using calibrated test instruments, calibrate ammeters, voltmeters, etc. Verify continuity of metering selector switch contacts with ohmmeter. |
COMPREHENSIVE ELECTRICAL SYSTEM CHECKLIST | |
Secondary Distribution System | |
| Annual |
| Inspect to ensure that warning signs exist. Replace as required. | |
| Inspect enclosures for damage, unauthorized openings, and corrosion of metallic objects. | |
| Inspect air passages and remove any blockage. | |
| Inspect, investigate, and solve conditions for unusual odors. | |
| As equipment is operated and tested, listen, investigate, and solve conditions for unusual noises. | |
| Inspect electrical connections for degradation and tightness. | |
| Inspect electrical insulation for discoloration and degradation. | |
| Inspect equipment grounding components such as conductors and connections. | |
| Inspect insulators for damage. | |
| Inspect liquid immersed equipment for leaks and damage. | |
| Inspect indicating lights for correct illumination. | |
| Clean equipment. | |
| Tighten electrical connections.. | |
| Verify space heater operation | |
| Verify equipment grounding. | |
| Perform infrared test. | |
| Calibrate recording and indicating metering. | |
| Low Voltage Switchgear, Switchboards, and Panelboards | |
| Six Month: | |
| Inspect solid electrical insulation for discoloration and degradation. | |
| Annual: | |
| Review operator records. | |
| Inspect barriers and shutters for physical damage. | |
| Test phase bus insulation | |
| Service circuit breakers. | |
| Inspect drawout contacts for abnormal wear, tension, and discoloration. Correct as required. | |
| Inspect breakers’ current carrying components for discoloration that may indicate overheating. Replace as required. | |
| Inspect, operate, adjust, and lubricate mechanical linkages. Replace components as required. | |
| Verify interlocks preventing a closed switchgear drawout breaker from being withdrawn from or connected to the switchgear bus. | |
| Inspect and dress current carrying contacts on air circuit breakers in accordance with manufacturer’s recommendations. | |
| Test power circuit breakers. Perform test operations to prove correct actuation of breakers’ trip and close components, including spring charging motors, trip solenoids, indicating targets, etc. | |
| Perform contact resistance test. | |
| Perform insulation resistance test on each phase-to-phase and phase-to-ground using a megohmmeter. | |
| Prove circuit breaker operation by actuation of each associated protective device. | |
| Prove circuit breaker operation by actuation of each breaker’s manual control switch or handle. | |
| Test molded-case circuit breakers. Perform overcurrent test on critical load breakers to prove correct actuation of breaker’s trip and close components. | |
| Perform contact resistance test on critical load breakers. | |
| Prove circuit breaker operation by actuation of each breaker manual control switch or handle. | |
| Verify equipment alarms. | |
| Protective device calibration . | |
| Perform harmonics analysis | |
| Measure and record neutral currents. | |
| Transformers | |
| Annual: | |
| Inspect forced cooling system equipment for damage, etc | |
| Operate system by simulating high temperature at controlling devices. | |
| Verify transformer alarms. | |
| Motor Control Center | |
| Annual: | |
| Inspect main contacts and auxiliary contacts on contactors. | |
| Inspect pushbuttons, indicating lights, selector switches, etc. | |
| Inspect indicating lamps for burned out bulbs or improper illumination. | |
| Test phase bus insulation | |
| Inspect drawout contacts for abnormal wear, tension, and discoloration. Correct as required. | |
| Inspect units’ current carrying components for discoloration that may indicate overheating. | |
| Inspect, operate, adjust, and lubricate mechanical linkages. | |
| Verify mechanical interlocks. yr Inspect and dress current carrying contacts on switches and contactors in accordance with manufacturer’s recommendations. | |
| Motor Starter | |
| Annual: | |
| Manually operate switches and circuit breakers to verify correct operation. | |
| Operate starter unit using all manual and automatic control devices to ensure correct operation. | |
| Verify correct interlocking action with other associated equipment. | |
| Verify correct indicating light operation. | |
| Verify equipment alarms | |
| Automatic Transfer Switches | |
| Annual: | |
| Inspect, operate, adjust, and lubricate mechanical linkages. | |
| Verify operation of mechanical interlocks. | |
| Inspect and dress current carrying contacts in accordance with manufacturer’s recommendations. | |
| Test automatic transfer switches Perform insulation resistance test on each phase-to-phase and phase-to-ground using a megohmmeter. | |
| Perform contact resistance test. | |
| Prove correct operation of the transfer switches by manually initiating transfers in both directions. | |
| Simulate the automatic conditions requiring automatic transfer switches to transfer in both directions | |
| Verify starting generators where applicable. | |
| Verify correct indicating light operation. | |
| Verify equipment alarms | |
| Safety Switches | |
| Annual: | |
| Inspect, operate, adjust, and lubricate mechanical linkages. Replace components as required. | |
| Verify operation of mechanical interlocks. | |
| Inspect and dress current carrying contacts in accordance with manufacturer’s recommendations. | |
| Test safety switches Perform insulation resistance test on each phase-to-phase and phase-to-ground using a megohmmeter of each critical load switch. | |
| Perform contact resistance test on each critical load switch. | |
| Secondary Distribution Feeders | |
| Annual: | |
| Perform cable inspection | |
| Every 3 years: | |
| Perform cable insulation test | |
| Every 5 years: | |
| Perform busway insulation test | |
| ||
PHONE: (678) 546-6780 FAX: (678) 546-6782 | ||
Technical Support | Stedi-Power, Inc. | |
General Inquiries |
| |
| ||
Stedi-Power, Inc
5044 B U Bowman Drive #102
Buford, Georgia 30518
PHONE: (678) 546-6780
Last Updated: 07 Jun 2004
©1997-2004 Stedi-Power, Inc.
All trademarks are the property of their respective owners
All other rights reserved.